EMC Pre-scan: Pre-Compliance Testing Before You Certify
Find and fix EMC problems in a session with our engineers, while the design can still change, then move straight into formal testing in the same accredited lab.
- Find Problems While They Are Cheap: A pre-scan shows where your product sits against the limit lines before the design is frozen.
- Fix and Re-measure in One Session: Our engineers help you try a ferrite, a filter or a cable change and see the result straight away.
- Test Against Your Target Standard: We scan to the standard your product will be certified to, such as FCC Part 15 Subpart B, ICES-003 or CISPR 32.
- One Lab From Design to Report: When the design is ready, formal testing runs in our ISO/IEC 17025 accredited lab with no new lab to onboard.
Accredited EMC testing

ISO/IEC 17025
A2LA #5179.02

FCC recognized
Part 15/18/22 · wireless

ISED recognized
CAB CA0102
*No-obligation assessment. We’ll respond within 24 hours.
What is an EMC pre-scan?
An EMC pre-scan is pre-compliance testing: the same kind of emissions measurements used in formal EMC testing, run during design so you can see where your product stands before you commit to the full test. It suits any team with a prototype that has to pass FCC, ISED, CE or a product standard such as IEC 60601-1-2, and it is a direct way to find out whether a board revision fixed the problem.
Some engineers call it an EMC scan. You get plots against the limit lines for your target standard and an engineer beside you who can help work out where the energy is coming from.
Why products fail their first EMC test
When a product fails its formal test, the fix usually means a board change or a new enclosure part, then a retest, and the launch moves with it.
The causes tend to repeat:
- Switching power supplies that push noise onto the mains lead and radiate from the input wiring.
- Clock and data harmonics that escape on any cable long enough to behave as an antenna.
- Unshielded or poorly terminated cables, where the shield is connected at one end or through a long pigtail.
- Enclosure gaps and ground bonds, where a seam, a painted joint or a connector shell that is not bonded to the chassis breaks the shielding the design assumed.
Each of these is far cheaper to fix on a prototype than after tooling is cut.
Pre-scan vs formal EMC testing
| EMC pre-scan | Formal EMC testing | |
|---|---|---|
| Purpose | Find problems and test fixes during design | Show the product meets the standard |
| Scope | The tests and frequency ranges you are worried about | Every test the standard calls up |
| Output | Plots and data for design decisions | An accredited test report for FCC, ISED, CE and your customers |
| Changes during the session | Yes, try fixes and re-measure | Only documented modifications, recorded in the report |
| When | Prototype, after a board revision, after a failed test | Design frozen, production-representative samples |
| How it is booked | A session sized to what you want to check | A quoted test program |
A common sequence is to pre-scan a new design, fix what it shows, and book formal testing once the margins look healthy.
What a pre-scan can cover
Most pre-scans cover radiated and conducted emissions.
| Test | Standard examples | What we look for |
|---|---|---|
| Radiated emissions | CISPR 32, CISPR 11, FCC Part 15 Subpart B | Peaks near the limit line and the cable or board they come from |
| Conducted emissions | CISPR 32, CISPR 11, FCC Part 15 Subpart B | Supply noise on the mains lead, and how much filtering it needs |
Immunity checks can be added to the same visit as separately quoted tests. ESD to IEC 61000-4-2 shows where discharges to seams, buttons and connectors cause resets or lock-ups, and EFT and conducted immunity to IEC 61000-4-4 and IEC 61000-4-6 show how the product copes with disturbances arriving on its cables.
When to book a pre-scan
- When the first working prototype powers up
- After a board revision, a new power supply or a new enclosure
- Before you book a formal test date that a launch depends on
- After a failed formal test, to find and fix the cause before retesting
- When you add a radio module to a host product (see wireless testing)
How a pre-scan session runs
- Send us the details. Tell us about the product, the target market and standard, and, if it has already failed, which test and by how much.
- We agree the plan. Our engineer confirms which tests, limits and operating modes the session will cover and sizes the booking to match.
- Setup and first scan. The product is set up in the operating mode you want checked, and we take a baseline against the limit lines.
- Find and fix. Your engineers can attend and rework hardware during the session, while ours help you track the emissions to their source. Try a ferrite, a filter or a re-routed cable, and we re-measure straight away.
- Data and next step. You leave with the data package below, and when the design is ready we quote the formal test in the same lab.
What you get
- Plots against the limit lines for each test, showing frequency, level and margin.
- A test setup log recording the configuration, cables, operating mode and equipment used for each run.
- Data files from every scan, with the plot images and the measured data in Excel.
- An engineering pre-scan report, where it is part of the quote.
Standards we pre-scan to
Some of the standards we test to include the ones below. A pre-scan uses the emission limits of the standard your product will be certified to.
| Standard | What it covers | Typical products |
|---|---|---|
| FCC Part 15 Subpart B | Radiated and conducted emissions from digital devices in the US | Consumer and commercial electronics |
| ICES-003 | Emissions from information technology equipment, including digital apparatus, in Canada | Consumer and commercial electronics |
| CISPR 32 / EN 55032 | Emissions from multimedia and IT equipment | Computers, displays, AV and network equipment |
| CISPR 11 / EN 55011 | Emissions from industrial, scientific and medical equipment | Industrial machines, lab and medical equipment |
| CISPR 25 | Emissions from vehicle components | Automotive and off-highway electronics |
| IEC 60601-1-2 | EMC emissions for medical electrical equipment | Patient monitors, therapy and diagnostic devices |
| IEC 61326-1 | EMC emissions for measurement, control and lab equipment | Instruments, analyzers, process sensors |
| IEC 61000-6-4 | Generic emissions for industrial environments | Industrial controls and equipment |
Our formal EMC testing is ISO/IEC 17025 accredited by A2LA under certificate 5179.02; see our accreditations.
Technical specifications
- Pre-scans run in our semi-anechoic chamber
- Formal radiated testing runs in our 10 m semi-anechoic chamber
Why test with Megalab?
The pre-scan and the formal test happen in one lab. When the pre-scan shows healthy margins, formal testing is quoted and run here, in our ISO/IEC 17025 accredited lab in Aurora, Ontario. You do not ship the product to a second lab or brief a new team.
Engineers who help you fix it. A pre-scan is only as useful as the conversation around the plot. Our engineers help you debug on the spot, so the session ends with a change you have measured and a design that is closer to passing.
Recognized for the markets you are heading to. We are FCC recognized and ISED recognized under CAB CA0102, and certification for radios is arranged through our Recognized Testing Laboratory partner.
EMC, environmental and safety together. Environmental testing and product safety run in the same building, so those dates can be planned around the EMC work.
What we need to quote your pre-scan
- Product type and what it does
- Power input: mains, battery or DC, voltage and phase
- Size and weight, tabletop or floor-standing
- Cables and ports that leave the enclosure
- Whether it contains a radio or pre-certified radio module
- Target markets and the standard it will be certified to
- Which tests worry you most, and if it has already failed, which test and by how much
- Operating modes we need to run
- Spare parts you plan to try (ferrites, filter parts, alternate cables)
Send us the details and we will confirm the requirement and quote it. We respond within 24 hours.
EMC pre-scan FAQ
EMC pre-compliance testing is an informal run of the EMC measurements during design, before the formal test. It shows how close the product is to the limits and lets you try fixes while changes are still cheap. At Megalab we call it an EMC pre-scan.
FCC authorization, ISED filings and a CE declaration rely on the formal test report. A pre-scan gives you the data to reach that report with confidence. When the design is ready, formal testing runs in our ISO/IEC 17025 accredited lab.
It depends on how many tests you want to check and how many fixes you want to try. We size the session in the quote once we know the product and the target standard.
Most pre-scans cover radiated and conducted emissions. ESD, EFT and conducted immunity checks can be added to the same visit as separately quoted tests.
Yes. Your engineers can attend in person and rework hardware during the session. Bring the design engineer and the spare parts you want to try, so each fix is measured as soon as it is made.
A pre-scan checks your product against a standard during design. An EMI site survey measures the environment at a location, or tests installed equipment on site.
It depends on the tests, the size and power of the product and how long the session needs to be. Send us the details and we will confirm the requirement and quote it within 24 hours.
Book an EMC pre-scan and find out where your design stands before the formal test.
Related tests
Your Partner for EMC Compliance
Fix Problems Early
Find emissions issues while the design can still change.
Debug With Our Engineers
Try fixes in the session and re-measure straight away.
Accredited EMC Testing
ISO/IEC 17025 accredited by A2LA, certificate 5179.02. See our accreditations.









